Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of Lean Startup with its method-specific working model.
Innovation
Lean Startup
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.For uncertain business assumptions, the method forces the idea into contact with real market reactions early. It separates wishful picture, assumption, and observable behavior, so that learning becomes faster than planning. This translates uncertainty into measurable insight.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.
Complexitydifferent
HighMediumMediumHigh
Timedifferent
90-180 min2–4 h review as a planning range; preparation and evaluation additionalWochen bis Monate je Lernzyklus45-90 min
Participantsdifferent
3-8Designers, developers as users, and facilitation2-83-10
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
CoD Table, Prioritization SequencePrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsHypothesis list, MVPs, Learning reports, Pivot or persevere decisionRanked Backlog, Cost-of-Delay Assumptions
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
ArchitectureEngineeringFeedbackValidationTasks
LeanStartupValidationMVP
LeanEconomicsSequencePrioritization