methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Paper illustration for DACI
Decision Making
DACI
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.In cross-functional decisions, responsibilities quickly blur between approval, influence, and execution. DACI arranges these roles so decision pressure, contribution, and information stay cleanly separated.
Complexitydifferent
HighLowLowLow
Timedifferent
90-180 min15-45 min1-2 h30-60 min
Participantsdifferent
3-81-33-102-10
Formatdifferent
WorkshopAsyncWorkshopWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceADR File, Decision Log, RationaleArchitecture Canvas, Goals, Constraints, Quality AttributesDACI Matrix, Decision Owner, Decision Log
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
ArchitectureRationaleDocumentationGovernance
CanvasArchitectureAlignmentWorkshop
DecisionRolesGovernanceAlignment
Add more methods