methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
HighLowHighHigh
Timedifferent
90-180 min15-30 min2-8 h1-6 Wochen
Participantsdifferent
3-82-62-84-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceRoot cause notes, CountermeasuresProblem Analysis, Decision Analysis, Risk Plan8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
Root causeIncidentLeanProblem solving
Problem solvingRoot causeDecisionOperations
QualityProblem solvingRoot cause
Add more methods