methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
HighLowHighHigh
Timedifferent
90-180 min15-30 minSeveral meetings plus preparation and analysis; total effort depends on scope1-6 Wochen
Participantsdifferent
3-82-6Evaluation team, architects, and relevant stakeholders4-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
CoD Table, Prioritization SequenceRoot cause notes, CountermeasuresPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
PrioritizationDeliveryEconomicsDecision
Root causeIncidentLeanProblem solving
ArchitectureQualityRiskTradeoffsStakeholders
QualityProblem solvingRoot cause
Add more methods