View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Contradiction Analysis | ![]() Engineering Failure Scenario Analysis | ![]() Facilitation Decision Jam | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | When a system should improve while another measure suffers as a result, the method makes the underlying conflict precisely formulable. It separates the desired effect from its side effect. This makes solutions possible that address the contradiction deliberately instead of half-heartedly. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Medium | Medium | Low | Low |
Timedifferent | 60-120 min | 1-3 h | 60-90 min | 20–45 min |
Participantsdifferent | 2-8 | 3-8 | 4-10 | Small cross-functional group |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Contradiction Statement, Abstraction Notes, Solution Principles, Concept Ideas | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Problem Cluster, Prioritized Challenge, Experiment | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | ContradictionsInnovationProblem solving | FailureResilienceRisk | FacilitationDecisionProblem solvingWorkshop | RiskDecisionFailurePlanning |



