methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Context Map workspace showing the question, observations, and next decision.
Domain Modeling
Context Map
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of Goal Question Metric with its method-specific working model.
Engineering
Goal Question Metric
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Purposedifferent
When several contexts need to talk to each other, it makes their relationships and dependencies legible. It helps sort integration pressure and responsibilities across system boundaries.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.Helps clarify technical problems, hypotheses, and next steps in concrete terms. It breaks a technical problem into testable parts. The result is captured as a GQM table and metric briefs.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.
Complexitysame
MediumMediumMediumMedium
Timedifferent
1-3 h1-3 h90-180 min1-2 h
Participantsdifferent
2-83-83-64-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Context Map, Integration Patterns, Boundary NotesBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresGQM Table, Metric ProfilesAlignment Map, Open Issues, Decision Questions
Tagsno overlap
Domain-Driven DesignBoundariesStrategy
FlowMeasurementConstraints
MetricsMeasurementEngineeringAlignment
AlignmentStakeholdersStrategyFacilitation
Add more methods