View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Constraint Analysis | ![]() Delivery Cost of Delay | ![]() Architecture Architecture Decision Record | ![]() Architecture Request for Comments |
|---|---|---|---|---|
Purposedifferent | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale. |
Complexitydifferent | Low | High | Low | Medium |
Timedifferent | 30-90 min | 90-180 min | 15-45 min | 1-3 Wochen vom Draft bis zur Entscheidung |
Participantsdifferent | 2-8 | 3-8 | 1-3 | 3-20 Reviewer |
Formatdifferent | Workshop + async | Workshop | Async | Async |
Outputdifferent | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | CoD Table, Prioritization Sequence | ADR File, Decision Log, Rationale | RFC document, Reviewer comments, Decision rationale, Follow-up ADR or tickets |
Tagsno overlap | ConstraintsDecisionPlanningOptions | PrioritizationDeliveryEconomicsDecision | ArchitectureRationaleDocumentationGovernance | ArchitectureDecisionAsyncGovernance |



