View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Constraint Analysis | ![]() Operations Bottleneck Analysis | ![]() Decision Making Assumption Surfacing | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Low | Medium | Low | Low |
Timedifferent | 30-90 min | 1-3 h | 45-90 min | 20–45 min |
Participantsdifferent | 2-8 | 3-8 | 2-8 | Small cross-functional group |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Assumption List, Critical Assumptions, Learning Plan | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | ConstraintsDecisionPlanningOptions | FlowMeasurementConstraints | AssumptionsRiskDecisionDiscovery | RiskDecisionFailurePlanning |



