View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Change Analysis | ![]() Decision Making Three-Point Estimation | ![]() Operations Fault Tree Analysis | ![]() Facilitation Dot Estimation |
|---|---|---|---|---|
Purposedifferent | For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. |
Complexitydifferent | Medium | Medium | High | Low |
Timedifferent | 45-120 min | 10-30 min je Item | 2-6 h | 5-20 min |
Participantsdifferent | 2-6 | 1-8 | 3-8 | 3-20 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Change Matrix, Cause Hypotheses, Validation Questions, Action List | Three-Point Estimate, Risk Range, Assumption Notes | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Effort Heatmap, Risk Signals, Discussion Targets |
Tagsno overlap | ChangeRoot causeTroubleshootingComparison | EstimationUncertaintyForecasting | RiskRoot causeSafety | EstimationEffortRisk |



