methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
LowHighMediumMedium
Timedifferent
1-4 h30-90 min Setup, danach laufendlaufendOngoing
Participantsdifferent
1-51-82-122-12
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Context Diagram, Container Diagram, Component DiagramForecast Percentiles, Throughput Dataset, Risk CommunicationThroughput Data, Flow Forecast, Slicing RulesKanban board, WIP policies, Flow metrics
Tagsno overlap
ArchitectureCommunicationVisualization
ForecastingFlowDelivery
EstimationForecastingFlow
FlowVisual managementDelivery
Add more methods