methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration for ALPEN Method
Operations
ALPEN Method
Paper fishbone diagram with a measurable effect at the head and six labeled cause branches.
Operations
Fishbone Diagram
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitysame
LowLowLowLow
Timedifferent
1-4 h10-20 min daily30-60 min1-2 Tage
Participantsdifferent
1-512-81-4
Formatdifferent
Workshop + asyncAsyncWorkshopWorkshop + async
Outputdifferent
Context Diagram, Container Diagram, Component DiagramDaily Plan, Time Estimates, Review NotesFishbone Diagram, Cause Categories, Investigation BacklogArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
ArchitectureCommunicationVisualization
PlanningTime managementProductivityOperations
Root causeQualityOperations
ArchitectureDocumentationCommunication
Add more methods