View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Brainstorming | ![]() Innovation Crazy 8s | ![]() Agile Bucket System | ![]() Innovation Design Charrette |
|---|---|---|---|---|
Purposedifferent | When a team faces an open question with many obvious directions, the method first creates breadth instead of premature commitment. It separates idea flow from evaluation and makes lines of thought visible, creating a pool for selection and further development. | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | When a large batch of work needs a fast, rough estimate, it sorts items into predefined size buckets. It sorts work by value, risk, and delivery ability. The result is captured as a Bucketed Backlog, Relative Estimates, and Split Candidates. | In a tightly timed design process with many participants, the method pools several lines of thinking in a short time. It brings parallel design energy without letting the discussion tip into endless coordination. This quickly produces solid directions for architecture or space. |
Complexitydifferent | Low | Low | Medium | Medium |
Timedifferent | 30-60 min | 8-15 min | 30-90 min | Halber Tag bis mehrere Tage |
Participantsdifferent | 4-12 | 1-10 | 3-12 | 10-50 |
Formatsame | Workshop | Workshop | Workshop | Workshop |
Outputdifferent | Idea pool, Theme clusters, Shortlist | Sketch Set, Idea Shortlist, Direction Options | Bucketed Backlog, Relative Estimates, Split Candidates | Sketches and Concepts, Consolidated Solution Sketch, Prioritized Direction |
Tagsno overlap | BrainstormingIdeationCreativityWorkshopDivergence | BrainstormingSketchingSpeedDivergenceDesign sprint | EstimationBacklogRelative sizing | BrainstormingWorkshopCollaborationIdeation |



