View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Operations Waste Analysis | ![]() Operations Kaizen Event | ![]() Operations DMAIC |
|---|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. |
Complexitydifferent | Medium | Low | Medium | High |
Timedifferent | 1-3 h | 45-120 min | 0.5-5 Tage | 2-12 Wochen |
Participantsdifferent | 3-8 | 2-8 | 4-10 | 3-10 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Waste Map, Prioritized Waste, Improvement Backlog | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Project Charter, Measurement Plan, Cause Analysis, Control Plan |
Tagsno overlap | FlowMeasurementConstraints | WasteLeanProcess improvement | LeanContinuous improvementOperations | Continuous improvementQualityProcess improvement |



