View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Operations Time Blocking | ![]() Decision Making Pre-Mortem | ![]() Operations ALPEN Method |
|---|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. |
Complexitydifferent | Medium | Low | Low | Low |
Timedifferent | 1-3 h | 15-30 min Planung, laufend | 20–45 min | 10-20 min daily |
Participantsdifferent | 3-8 | 1 | Small cross-functional group | 1 |
Formatdifferent | Workshop + async | Async | Workshop | Async |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Blocked Calendar, Capacity View, Focus Plan | Risk list, Mitigation plan, Assumption log | Daily Plan, Time Estimates, Review Notes |
Tagsno overlap | FlowMeasurementConstraints | PlanningTime managementFocus | RiskDecisionFailurePlanning | PlanningTime managementProductivityOperations |