methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.
Complexitysame
MediumMediumMediumMedium
Timedifferent
1-3 h10-30 min je ItemOngoing15-45 min
Participantsdifferent
3-81-82-121-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresThree-Point Estimate, Risk Range, Assumption NotesKanban board, WIP policies, Flow metricsPERT Estimate, Expected Value, Risk Notes
Tagsno overlap
FlowMeasurementConstraints
EstimationUncertaintyForecasting
FlowVisual managementDelivery
EstimationUncertaintyRisk
Add more methods