methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration for Planning Poker.
Agile
Planning Poker
Paper illustration for Bucket System.
Agile
Bucket System
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.When estimates within the team diverge too much, it puts differing expectations on a common test bench. It separates rough complexity from unspoken assumptions.When a large batch of work needs a fast, rough estimate, it sorts items into predefined size buckets. It sorts work by value, risk, and delivery ability. The result is captured as a Bucketed Backlog, Relative Estimates, and Split Candidates.
Complexitydifferent
MediumHighLowMedium
Timedifferent
1-3 h2-4 h Analyse, laufend2-5 min je Item30-90 min
Participantsdifferent
3-83-123-93-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresConstraint Map, Improvement Plan, Flow MetricsRelative Estimates, Assumption Notes, Split CandidatesBucketed Backlog, Relative Estimates, Split Candidates
Tagsno overlap
FlowMeasurementConstraints
OperationsConstraintsFlowImprovement
EstimationAgileRelative sizingTeam
EstimationBacklogRelative sizing
Add more methods