View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Operations Process Mapping | ![]() Operations Kaizen Event | ![]() Operations Theory of Constraints |
|---|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | With a confusing workflow that has many handoffs, the method makes the actual process visible. It shows where work is passed on, delayed, or duplicated, so improvement targets the right spots. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. |
Complexitydifferent | Medium | Medium | Medium | High |
Timedifferent | 1-3 h | 1-3 h | 0.5-5 Tage | 2-4 h Analyse, laufend |
Participantsdifferent | 3-8 | 3-10 | 4-10 | 3-12 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Process Map, Handoff List, Improvement Backlog | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Constraint Map, Improvement Plan, Flow Metrics |
Tagsno overlap | FlowMeasurementConstraints | ProcessOperationsImprovement | LeanContinuous improvementOperations | OperationsConstraintsFlowImprovement |



