View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Agile Mad Sad Glad | ![]() Team Design Spotify Model Mapping | ![]() Facilitation Expectation Mapping |
|---|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | When a team's or workshop's mood needs to become readable, it structures emotional signals with little setup. It makes strain, relief, and sources of energy tangible. | When a team landscape has grown without clear grouping, it maps roles and relationships onto the Spotify model. It clarifies responsibility, interaction, and load between teams. The result is captured as a Spotify model map and action list. | When roles, interfaces, or projects fail because of differing expectations, Expectation Mapping surfaces these differences. It shows what each side takes for granted and where the pictures diverge. |
Complexitydifferent | Medium | Low | Medium | Low |
Timedifferent | 1-3 h | 30-60 min | 90-180 min | 45-90 min |
Participantsdifferent | 3-8 | 3-10 | 5-15 | 3-12 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Emotion Board, Themes, Action Items | Spotify Model Map, Action List | Expectation Map, Alignment Notes, Agreements |
Tagsno overlap | FlowMeasurementConstraints | RetrospectiveTeamReflection | TeamOrganizationAlignmentDiagnosis | AlignmentStakeholdersTeam |



