methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.
Complexitysame
MediumMediumMediumMedium
Timedifferent
1-3 hOngoinglaufend10-30 min je Item
Participantsdifferent
3-82-122-121-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresKanban board, WIP policies, Flow metricsThroughput Data, Flow Forecast, Slicing RulesThree-Point Estimate, Risk Range, Assumption Notes
Tagsno overlap
FlowMeasurementConstraints
FlowVisual managementDelivery
EstimationForecastingFlow
EstimationUncertaintyForecasting
Add more methods