methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Iceberg Model method illustration showing its working structure
Systems Thinking
Iceberg Model
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.The Iceberg Model separates visible events from patterns, structures, and mental models. This turns a single observation into a deeper understanding of why a problem keeps recurring.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.
Complexitydifferent
MediumMediumLowHigh
Timedifferent
1-3 hOngoing30-60 min2-6 h
Participantsdifferent
3-82-122-103-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresKanban board, WIP policies, Flow metricsIceberg Worksheet, Pattern Notes, Intervention IdeasCurrent Reality Tree, Core Problems, Intervention Ideas
Tagsno overlap
FlowMeasurementConstraints
FlowVisual managementDelivery
Systems thinkingRoot causePatterns
Systems thinkingRoot causeConstraintsCausality
Add more methods