methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Iceberg Model method illustration showing its working structure
Systems Thinking
Iceberg Model
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.The Iceberg Model separates visible events from patterns, structures, and mental models. This turns a single observation into a deeper understanding of why a problem keeps recurring.
Complexitydifferent
MediumMediumHighLow
Timedifferent
1-3 hOngoing2-6 h30-60 min
Participantsdifferent
3-82-123-82-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresKanban board, WIP policies, Flow metricsCurrent Reality Tree, Core Problems, Intervention IdeasIceberg Worksheet, Pattern Notes, Intervention Ideas
Tagsno overlap
FlowMeasurementConstraints
FlowVisual managementDelivery
Systems thinkingRoot causeConstraintsCausality
Systems thinkingRoot causePatterns
Add more methods