methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Architecture Communication Canvas method illustration showing its working structure
Architecture
Architecture Communication Canvas
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.The Architecture Communication Canvas plans architecture communication so the right people receive the right message. The method turns technical complexity into deliberate communication design.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
1-3 hOngoing60-120 min1-4 h
Participantsdifferent
3-82-122-81-5
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresKanban board, WIP policies, Flow metricsCommunication Canvas, Stakeholder Messages, Architecture Communication PlanContext Diagram, Container Diagram, Component Diagram
Tagsno overlap
FlowMeasurementConstraints
FlowVisual managementDelivery
ArchitectureCommunicationStakeholdersCanvas
ArchitectureCommunicationVisualization
Add more methods