methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Expectation Mapping.
Facilitation
Expectation Mapping
Paper illustration for Starfish Retrospective
Agile
Starfish Retrospective
Paper illustration for Sailboat Retrospective
Agile
Sailboat Retrospective
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When roles, interfaces, or projects fail because of differing expectations, Expectation Mapping surfaces these differences. It shows what each side takes for granted and where the pictures diverge.When improvement options need to be sorted more finely than just start and stop, it brings observations into clear kinds of action. This makes visible what should be done more, less, newly, or continued.When a team wants to read momentum, brakes, and risks together, it offers an easily understandable picture of the situation. It makes drive, obstacles, and headwind visible in the same picture.
Complexitydifferent
MediumLowLowLow
Timedifferent
1-3 h45-90 min45-90 min45-90 min
Participantsdifferent
3-83-124-124-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresExpectation Map, Alignment Notes, AgreementsStarfish Board, Practice Changes, ExperimentsSailboat Board, Risks, Improvement Actions
Tagsno overlap
FlowMeasurementConstraints
AlignmentStakeholdersTeam
RetrospectiveImprovementExperimentsTeam
RetrospectiveTeamImprovement
Add more methods