View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Bottleneck Analysis | ![]() Innovation Design Sprint | ![]() Product Discovery MVP Test Matrix | ![]() Product Discovery Fake Door Test |
|---|---|---|---|---|
Purposedifferent | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | When several minimal variants compete to answer the same question, it makes comparing and choosing between them cleaner. It separates problem, assumption, solution, and evidence. The result is captured as a Test Matrix and a Test Plan. | When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small. |
Complexitydifferent | Medium | High | Medium | Medium |
Timedifferent | 1-3 h | 4-5 Tage | 45-75 min | 1-5 Tage |
Participantsdifferent | 3-8 | 5-8 | 2-8 | Nutzertraffic |
Formatdifferent | Workshop + async | Workshop | Workshop | Async |
Outputdifferent | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures | Prototype, Test Findings, Decision Rationale | Test Matrix, Test Plan | Click Data, Interest Signal, Learning Decision |
Tagsno overlap | FlowMeasurementConstraints | Design sprintPrototypeValidationInnovation | ExperimentsValidationDiscoveryOptions | ValidationExperimentsDemandDiscovery |



