methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of Five-Minute VC Check with its method-specific working model.
Business Strategy
5-Minuten VC-Check
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.The 5-Minute VC Check clarifies opportunities and strategic options at the earliest idea stage. It compares problem quality, customer willingness to pay, alternatives, differentiation, and market potential, and captures the result as a VC-check note, go/sharpen/park decision, and risk list.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumMediumLowLow
Timedifferent
1-3 h2–4 h review as a planning range; preparation and evaluation additional5-15 min60-90 min
Participantsdifferent
3-8Designers, developers as users, and facilitation1-54-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Bottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsVC-check note, Go/sharpen/park decision, Risk and assumption list, Next validation stepAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
FlowMeasurementConstraints
ArchitectureEngineeringFeedbackValidationTasks
StartupValidationCompetition
RiskArchitectureWorkshopValidation
Add more methods