methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Root Cause Tree Analysis
Operations
Root Cause Tree Analysis
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper fishbone diagram with a measurable effect at the head and six labeled cause branches.
Operations
Fishbone Diagram
Purposedifferent
ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.For a problem with several suspected causes, the method builds a causal structure instead of a mere list. It makes visible how causes connect and where the strongest points of leverage lie.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers.
Complexitydifferent
HighMediumHighLow
Timedifferent
Several meetings plus preparation and analysis; total effort depends on scope1-3 h2-6 h30-60 min
Participantsdifferent
Evaluation team, architects, and relevant stakeholders2-83-102-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsCause Tree, Evidence Notes, CountermeasuresFMEA Table, Risk Priority, Mitigation ActionsFishbone Diagram, Cause Categories, Investigation Backlog
Tags1 shared
ArchitectureQualityRiskTradeoffsStakeholders
Root causeTreeIncidentQuality
RiskQualityOperationsRoot cause
Root causeQualityOperations
Add more methods