methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
HighLowLowLow
Timedifferent
Several meetings plus preparation and analysis; total effort depends on scope1-2 Tage1-2 h60-90 min
Participantsdifferent
Evaluation team, architects, and relevant stakeholders1-43-104-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Prioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsArchitecture Document, Context View, Runtime View, Deployment ViewArchitecture Canvas, Goals, Constraints, Quality AttributesAnnotated Diagram, Prioritized Risk List, Action Backlog
Tags1 shared
ArchitectureQualityRiskTradeoffsStakeholders
ArchitectureDocumentationCommunication
CanvasArchitectureAlignmentWorkshop
RiskArchitectureWorkshopValidation
Add more methods