View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Systems Thinking Future Reality Tree | ![]() Operations 8D Problem Solving | ![]() Operations Kepner-Tregoe |
|---|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. |
Complexitydifferent | Low | High | High | High |
Timedifferent | 45-90 min | 2-4 h | 1-6 Wochen | 2-8 h |
Participantsdifferent | 2-8 | 3-8 | 4-10 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | Problem Analysis, Decision Analysis, Risk Plan |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | Theory of ConstraintsSystems thinkingChange | QualityProblem solvingRoot cause | Problem solvingRoot causeDecisionOperations |



