View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Engineering Failure Scenario Analysis | ![]() Systems Thinking Future Reality Tree | ![]() Product Strategy DIBB |
|---|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report. |
Complexitydifferent | Low | Medium | High | Low |
Timedifferent | 45-90 min | 1-3 h | 2-4 h | 1-2 h |
Participantsdifferent | 2-8 | 3-8 | 3-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop + async |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | DIBB document, Belief list, Bet list, Learning report |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | FailureResilienceRisk | Theory of ConstraintsSystems thinkingChange | StrategyDecisionAssumptionsHypothesis |



