View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Assumption Surfacing | ![]() Operations ALPEN Method | ![]() Operations Failure Mode and Effects Analysis | ![]() Operations Fishbone Diagram |
|---|---|---|---|---|
Purposedifferent | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers. |
Complexitydifferent | Low | Low | High | Low |
Timedifferent | 45-90 min | 10-20 min daily | 2-6 h | 30-60 min |
Participantsdifferent | 2-8 | 1 | 3-10 | 2-8 |
Formatdifferent | Workshop + async | Async | Workshop | Workshop |
Outputdifferent | Assumption List, Critical Assumptions, Learning Plan | Daily Plan, Time Estimates, Review Notes | FMEA Table, Risk Priority, Mitigation Actions | Fishbone Diagram, Cause Categories, Investigation Backlog |
Tagsno overlap | AssumptionsRiskDecisionDiscovery | PlanningTime managementProductivityOperations | RiskQualityOperationsRoot cause | Root causeQualityOperations |



