methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Purposedifferent
Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.
Complexitydifferent
LowMediumHighHigh
Timedifferent
45-90 min45-90 min90-180 min45-90 min
Participantsdifferent
2-82-53-83-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Assumption List, Critical Assumptions, Learning PlanA3 Report, Action Plan, Root Cause AnalysisCoD Table, Prioritization SequenceRanked Backlog, Cost-of-Delay Assumptions
Tagsno overlap
AssumptionsRiskDecisionDiscovery
LeanProblem solvingCoachingOperations
PrioritizationDeliveryEconomicsDecision
LeanEconomicsSequencePrioritization
Add more methods