methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.When a group needs a solid decision without outvoting individual factions, a Consensus Workshop creates a negotiable common ground. It makes agreement, reservations, and open tensions discussable at the same time.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
2–4 h review as a planning range; preparation and evaluation additional1-3 Wochen vom Draft bis zur Entscheidung1-3 h60-90 min
Participantsdifferent
Designers, developers as users, and facilitation3-20 Reviewer5-304-10
Formatdifferent
Workshop + asyncAsyncWorkshopWorkshop
Outputdifferent
Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsRFC document, Reviewer comments, Decision rationale, Follow-up ADR or ticketsConsensus Clusters, Theme Titles, Priority AreasProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
ArchitectureEngineeringFeedbackValidationTasks
ArchitectureDecisionAsyncGovernance
FacilitationConsensusWorkshopAlignment
FacilitationDecisionProblem solvingWorkshop
Add more methods