View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Innovation Lean Startup | ![]() Agile WSJF | ![]() Delivery Cost of Delay |
|---|---|---|---|---|
Purposedifferent | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | For uncertain business assumptions, the method forces the idea into contact with real market reactions early. It separates wishful picture, assumption, and observable behavior, so that learning becomes faster than planning. This translates uncertainty into measurable insight. | When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. |
Complexitydifferent | Medium | Medium | High | High |
Timedifferent | 2–4 h review as a planning range; preparation and evaluation additional | Wochen bis Monate je Lernzyklus | 45-90 min | 90-180 min |
Participantsdifferent | Designers, developers as users, and facilitation | 2-8 | 3-10 | 3-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop |
Outputdifferent | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | Hypothesis list, MVPs, Learning reports, Pivot or persevere decision | Ranked Backlog, Cost-of-Delay Assumptions | CoD Table, Prioritization Sequence |
Tagsno overlap | ArchitectureEngineeringFeedbackValidationTasks | LeanStartupValidationMVP | LeanEconomicsSequencePrioritization | PrioritizationDeliveryEconomicsDecision |



