methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper Kanban board with To Discuss, Discussing and Discussed columns, topic cards, votes and timer.
Facilitation
Lean Coffee
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.When a group without a fixed agenda needs to get into useful conversations quickly, Lean Coffee structures the start around interests rather than a presentation. The group itself negotiates which topics get time first and which wait.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
MediumLowLowLow
Timedifferent
2–4 h review as a planning range; preparation and evaluation additional30-90 min60-90 min60-90 min
Participantsdifferent
Designers, developers as users, and facilitation3-204-124-10
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsPrioritized Topics, Discussion Notes, Action ItemsAnnotated Diagram, Prioritized Risk List, Action BacklogProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
ArchitectureEngineeringFeedbackValidationTasks
FacilitationAutonomyDialogue
RiskArchitectureWorkshopValidation
FacilitationDecisionProblem solvingWorkshop
Add more methods