methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
Paper illustration of a four-quadrant grid with tasks sorted by importance and urgency and translated into actions.
Decision Making
Eisenhower Matrix
Purposedifferent
ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.It separates true priorities from noise so it becomes clear what should be done now, scheduled, delegated, or dropped.
Complexitydifferent
MediumHighMediumLow
Timedifferent
2–4 h review as a planning range; preparation and evaluation additional90-180 min1-3 Wochen vom Draft bis zur Entscheidung15-30 min
Participantsdifferent
Designers, developers as users, and facilitation3-83-20 Reviewer1-6
Formatdifferent
Workshop + asyncWorkshopAsyncWorkshop + async
Outputdifferent
Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsCoD Table, Prioritization SequenceRFC document, Reviewer comments, Decision rationale, Follow-up ADR or ticketsEisenhower Matrix, Action List, Delegation Notes
Tagsno overlap
ArchitectureEngineeringFeedbackValidationTasks
PrioritizationDeliveryEconomicsDecision
ArchitectureDecisionAsyncGovernance
PrioritizationFocusTasks
Add more methods