View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture ARID (Active Reviews for Intermediate Designs) | ![]() Delivery Cost of Delay | ![]() Product Strategy ICE Scoring | ![]() Decision Making Decision Matrix |
|---|---|---|---|---|
Purposedifferent | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. | Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence. | When ideas need sorting quickly, it condenses impact, confidence, and effort into one compact score. It connects customer value, product logic, and decision priorities. The result is captured as an ICE table and top-ideas list. | When several options collide with several criteria, comparison quickly becomes subjective. A Decision Matrix makes the trade-off visible and brings weighting, criteria, and options into a shared logic. |
Complexitydifferent | Medium | High | Low | Medium |
Timedifferent | 2–4 h review as a planning range; preparation and evaluation additional | 90-180 min | 30-60 min | 45-90 min |
Participantsdifferent | Designers, developers as users, and facilitation | 3-8 | 2-8 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions | CoD Table, Prioritization Sequence | ICE Table, Top Idea List | Decision Matrix, Scoring Rationale, Selected Option |
Tagsno overlap | ArchitectureEngineeringFeedbackValidationTasks | PrioritizationDeliveryEconomicsDecision | PrioritizationScoringGrowthDecision | DecisionCriteriaScoringTradeoffs |



