methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
MediumLowLowLow
Timedifferent
2–4 h review as a planning range; preparation and evaluation additional1-2 Tage1-2 h60-90 min
Participantsdifferent
Designers, developers as users, and facilitation1-43-104-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsArchitecture Document, Context View, Runtime View, Deployment ViewArchitecture Canvas, Goals, Constraints, Quality AttributesAnnotated Diagram, Prioritized Risk List, Action Backlog
Tags1 shared
ArchitectureEngineeringFeedbackValidationTasks
ArchitectureDocumentationCommunication
CanvasArchitectureAlignmentWorkshop
RiskArchitectureWorkshopValidation
Add more methods