methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
LowHighLowHigh
Timedifferent
1-2 Tage45-90 min1-4 h90-180 min
Participantsdifferent
1-43-101-53-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Architecture Document, Context View, Runtime View, Deployment ViewRanked Backlog, Cost-of-Delay AssumptionsContext Diagram, Container Diagram, Component DiagramCoD Table, Prioritization Sequence
Tagsno overlap
ArchitectureDocumentationCommunication
LeanEconomicsSequencePrioritization
ArchitectureCommunicationVisualization
PrioritizationDeliveryEconomicsDecision
Add more methods