View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Agile Affinity Estimation | ![]() Facilitation Dot Estimation | ![]() Systems Thinking Intervention Mapping | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|---|
Purposedifferent | When many tasks need to be classified quickly, it sorts them by perceived effort and similarity. It reduces the effort of fine-grained estimation for large volumes. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | Medium | Low | High | High |
Timedifferent | 30-90 min | 5-20 min | 1-5 Tage | 2-4 h |
Participantsdifferent | 3-12 | 3-20 | 4-12 | 3-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Affinity Size Map, Grouped Estimates, Unclear Items | Effort Heatmap, Risk Signals, Discussion Targets | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | EstimationBacklogRelative sizing | EstimationEffortRisk | ChangeSystems thinkingCapability | Theory of ConstraintsSystems thinkingChange |



