methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Affinity Estimation.
Agile
Affinity Estimation
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration for Bucket System.
Agile
Bucket System
Purposedifferent
When many tasks need to be classified quickly, it sorts them by perceived effort and similarity. It reduces the effort of fine-grained estimation for large volumes.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.When a large batch of work needs a fast, rough estimate, it sorts items into predefined size buckets. It sorts work by value, risk, and delivery ability. The result is captured as a Bucketed Backlog, Relative Estimates, and Split Candidates.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
30-90 min1-3 h2-4 h Analyse, laufend30-90 min
Participantsdifferent
3-123-83-123-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Affinity Size Map, Grouped Estimates, Unclear ItemsBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresConstraint Map, Improvement Plan, Flow MetricsBucketed Backlog, Relative Estimates, Split Candidates
Tagsno overlap
EstimationBacklogRelative sizing
FlowMeasurementConstraints
OperationsConstraintsFlowImprovement
EstimationBacklogRelative sizing
Add more methods