View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Architecture Decision Record | ![]() Operations Change Analysis | ![]() Operations Kepner-Tregoe | ![]() Architecture Request for Comments |
|---|---|---|---|---|
Purposedifferent | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise. | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. | An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale. |
Complexitydifferent | Low | Medium | High | Medium |
Timedifferent | 15-45 min | 45-120 min | 2-8 h | 1-3 Wochen vom Draft bis zur Entscheidung |
Participantsdifferent | 1-3 | 2-6 | 2-8 | 3-20 Reviewer |
Formatdifferent | Async | Workshop + async | Workshop + async | Async |
Outputdifferent | ADR File, Decision Log, Rationale | Change Matrix, Cause Hypotheses, Validation Questions, Action List | Problem Analysis, Decision Analysis, Risk Plan | RFC document, Reviewer comments, Decision rationale, Follow-up ADR or tickets |
Tagsno overlap | ArchitectureRationaleDocumentationGovernance | ChangeRoot causeTroubleshootingComparison | Problem solvingRoot causeDecisionOperations | ArchitectureDecisionAsyncGovernance |



