methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitydifferent
LowHighHighMedium
Timedifferent
30-60 min2-4 h Analyse, laufend90-180 min1-3 h
Participantsdifferent
1-53-123-83-8
Formatdifferent
AsyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
ABC Classification, Focus Rules, Control ListConstraint Map, Improvement Plan, Flow MetricsCoD Table, Prioritization SequenceBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
PrioritizationOperationsPortfolio
OperationsConstraintsFlowImprovement
PrioritizationDeliveryEconomicsDecision
FlowMeasurementConstraints
Add more methods