View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ABC Analysis | ![]() Operations Theory of Constraints | ![]() Operations A3 Problem Solving | ![]() Operations Bottleneck Analysis |
|---|---|---|---|---|
Purposedifferent | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. | For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together. | For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput. |
Complexitydifferent | Low | High | Medium | Medium |
Timedifferent | 30-60 min | 2-4 h Analyse, laufend | 45-90 min | 1-3 h |
Participantsdifferent | 1-5 | 3-12 | 2-5 | 3-8 |
Formatdifferent | Async | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | ABC Classification, Focus Rules, Control List | Constraint Map, Improvement Plan, Flow Metrics | A3 Report, Action Plan, Root Cause Analysis | Bottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures |
Tagsno overlap | PrioritizationOperationsPortfolio | OperationsConstraintsFlowImprovement | LeanProblem solvingCoachingOperations | FlowMeasurementConstraints |



