View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ABC Analysis | ![]() Architecture Request for Comments | ![]() Decision Making Risk Matrix | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Medium | Low | Low |
Timedifferent | 30-60 min | 1-3 Wochen vom Draft bis zur Entscheidung | 30-60 min | 45-90 min |
Participantsdifferent | 1-5 | 3-20 Reviewer | 3-10 | 2-8 |
Formatdifferent | Async | Async | Workshop + async | Workshop + async |
Outputdifferent | ABC Classification, Focus Rules, Control List | RFC document, Reviewer comments, Decision rationale, Follow-up ADR or tickets | Risk Matrix, Top Risk List | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | PrioritizationOperationsPortfolio | ArchitectureDecisionAsyncGovernance | RiskDecisionPrioritizationAssessment | AssumptionsRiskDecisionDiscovery |



