View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations ABC Analysis | ![]() Decision Making Assumption Surfacing | ![]() Architecture Architecture Decision Record | ![]() Architecture Request for Comments |
|---|---|---|---|---|
Purposedifferent | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale. |
Complexitydifferent | Low | Low | Low | Medium |
Timedifferent | 30-60 min | 45-90 min | 15-45 min | 1-3 Wochen vom Draft bis zur Entscheidung |
Participantsdifferent | 1-5 | 2-8 | 1-3 | 3-20 Reviewer |
Formatdifferent | Async | Workshop + async | Async | Async |
Outputdifferent | ABC Classification, Focus Rules, Control List | Assumption List, Critical Assumptions, Learning Plan | ADR File, Decision Log, Rationale | RFC document, Reviewer comments, Decision rationale, Follow-up ADR or tickets |
Tagsno overlap | PrioritizationOperationsPortfolio | AssumptionsRiskDecisionDiscovery | ArchitectureRationaleDocumentationGovernance | ArchitectureDecisionAsyncGovernance |



