methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumHighHighLow
Timedifferent
45-90 min45-90 min90-180 min15-30 min
Participantsdifferent
2-53-103-82-6
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
A3 Report, Action Plan, Root Cause AnalysisRanked Backlog, Cost-of-Delay AssumptionsCoD Table, Prioritization SequenceRoot cause notes, Countermeasures
Tagsno overlap
LeanProblem solvingCoachingOperations
LeanEconomicsSequencePrioritization
PrioritizationDeliveryEconomicsDecision
Root causeIncidentLeanProblem solving
Add more methods