View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations 8D Problem Solving | ![]() Decision Making Constraint Analysis | ![]() Operations Failure Mode and Effects Analysis | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | High | Low | High | Low |
Timedifferent | 1-6 Wochen | 30-90 min | 2-6 h | 20–45 min |
Participantsdifferent | 4-10 | 2-8 | 3-10 | Small cross-functional group |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop |
Outputdifferent | 8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries | FMEA Table, Risk Priority, Mitigation Actions | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | QualityProblem solvingRoot cause | ConstraintsDecisionPlanningOptions | RiskQualityOperationsRoot cause | RiskDecisionFailurePlanning |



