methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
LowHighHighHigh
Timedifferent
15-30 min45-90 min90-180 min2-8 h
Participantsdifferent
2-63-103-82-8
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Root cause notes, CountermeasuresRanked Backlog, Cost-of-Delay AssumptionsCoD Table, Prioritization SequenceProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
Root causeIncidentLeanProblem solving
LeanEconomicsSequencePrioritization
PrioritizationDeliveryEconomicsDecision
Problem solvingRoot causeDecisionOperations
Add more methods