View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation 1-2-4-All | ![]() Facilitation Decision Jam | ![]() Architecture Architecture Decision Record | ![]() Architecture Request for Comments |
|---|---|---|---|---|
Purposedifferent | When many people in a group too rarely get to speak, 1-2-4-All distributes thinking time more fairly. The format builds participation step by step and makes quiet or still-unformed thoughts usable faster. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale. |
Complexitydifferent | Low | Low | Low | Medium |
Timedifferent | 10-20 min | 60-90 min | 15-45 min | 1-3 Wochen vom Draft bis zur Entscheidung |
Participantsdifferent | 4-100+ | 4-10 | 1-3 | 3-20 Reviewer |
Formatdifferent | Workshop | Workshop | Async | Async |
Outputdifferent | Idea List, Shared Insights, Emergent Themes | Problem Cluster, Prioritized Challenge, Experiment | ADR File, Decision Log, Rationale | RFC document, Reviewer comments, Decision rationale, Follow-up ADR or tickets |
Tagsno overlap | FacilitationInclusionIdeation | FacilitationDecisionProblem solvingWorkshop | ArchitectureRationaleDocumentationGovernance | ArchitectureDecisionAsyncGovernance |



