Plan my session
Plan a concrete work block with agenda, roles, preparation, and a copyable result artifact.
Session: Risk Storming
The plan translates the method into a concrete facilitated work block. Your inputs flow directly into the session brief and work artifact.
Method session with 4-12. The plan uses the existing method logic and the runsheet.
RunsheetUse the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
The session works directly toward Annotiertes Diagramm. After the session, the artifact should be shareable, reviewable, or reusable.
- 1
Phase 1: Introduce context and categories
10 minFacilitator presents diagram (5 min), answers clarification questions. Explain risk categories and note colors. Give examples per category. Hint: If understanding questions about diagram remain after 10 min, postpone workshop. Risk identification without architecture understanding is speculation.
FacilitatorAnnotiertes Diagramm - 2
Phase 2: Silent sticking phase
20 minEach participant notes risks on sticky notes (one note, one risk, color by category) and sticks them to the matching place in the diagram. No discussion. Hint: Silence protects from anchoring effects. Anyone speaking gets one reminder. On repeated violation, short pause and reset. Silent phase is core protection of method.
FacilitatorRisikoliste mit Priorisierung - 3
Phase 3: Cluster and prioritize
20-30 minTogether identify clusters and duplicates. Rate probability and impact (1-5) per cluster. Extract top risks from red area (P*I >=15). Hint: Clusters are more important than individual mentions. If 5 participants independently name same risk, consensus is strong. Single mentions can still be valid, but examine more critically.
FacilitatorMaßnahmen-Backlog - 4
Phase 4: Owner and action
15-20 minName owner per top risk, define next action (spike, mitigation, ROAM entry), set deadline. Maximum 5-7 top risks, rest into backlog. Hint: Without owner, workshop fizzles. At least five risks with owner and deadline before end. Risk without action should be explicitly Accepted instead of forgotten.
OwnerAnnotiertes Diagramm - 5
Publish artifact
10 minCheck the artifact for completeness, define location, set version or status, and name review recipients.
OwnerAnnotiertes Diagramm
Session Brief
For invitations, boards, tickets, PR descriptions, or workshop notes.
session-brief.md
Session Brief: Risk Storming
Goal
Artifact: Annotiertes Diagramm
Working Question
Which risks are embedded in this architecture or plan artifact, and which of them need action before the next iteration?
Context
Architecture diagram distributed 1-2 days beforehand with request to read; list of known incidents/problems from last 6 months; Quality Attributes (security, availability, scalability); risk category definition.
Setup
- Format: Method session
- Duration: 60-90 min
- Mode: Workshop
- Participants: One facilitator who protects silent phase and moderates clusters; 4-12 participants from mixed roles (architecture, engineering, operations, security, product); one scribe for owner assignment and actions.
- Owner: One facilitator who protects silent phase and moderates clusters
- Participation mode: Team round, shared work and alignment
- Outcome logic: Finish artifact
Participation Logic
Use the session for shared understanding. Contributions are collected visibly, assumptions are aligned, and open differences remain traceable in the artifact.
Outcome Logic
The session works directly toward Annotiertes Diagramm. After the session, the artifact should be shareable, reviewable, or reusable.
Input
Large-format print or digital board with architecture diagram at least A1 size; red, yellow, blue sticky notes for risk categories (technical, organizational, external); markers; timer; risk scoring grid (probability/impact).
Preparation
Diagram central on wall. Risk categories visible as legend (red=technical, yellow=organizational, blue=external). Announce silence rule. Evaluation grid (P/I 1-5) as banner.
Agenda
-
Phase 1: Introduce context and categories (10 min) Owner: Facilitator Action: Facilitator presents diagram (5 min), answers clarification questions. Explain risk categories and note colors. Give examples per category. Hint: If understanding questions about diagram remain after 10 min, postpone workshop. Risk identification without architecture understanding is speculation. Output: Annotiertes Diagramm
-
Phase 2: Silent sticking phase (20 min) Owner: Facilitator Action: Each participant notes risks on sticky notes (one note, one risk, color by category) and sticks them to the matching place in the diagram. No discussion. Hint: Silence protects from anchoring effects. Anyone speaking gets one reminder. On repeated violation, short pause and reset. Silent phase is core protection of method. Output: Risikoliste mit Priorisierung
-
Phase 3: Cluster and prioritize (20-30 min) Owner: Facilitator Action: Together identify clusters and duplicates. Rate probability and impact (1-5) per cluster. Extract top risks from red area (P*I >=15). Hint: Clusters are more important than individual mentions. If 5 participants independently name same risk, consensus is strong. Single mentions can still be valid, but examine more critically. Output: Maßnahmen-Backlog
-
Phase 4: Owner and action (15-20 min) Owner: Owner Action: Name owner per top risk, define next action (spike, mitigation, ROAM entry), set deadline. Maximum 5-7 top risks, rest into backlog. Hint: Without owner, workshop fizzles. At least five risks with owner and deadline before end. Risk without action should be explicitly Accepted instead of forgotten. Output: Annotiertes Diagramm
-
Publish artifact (10 min) Owner: Owner Action: Check the artifact for completeness, define location, set version or status, and name review recipients. Output: Annotiertes Diagramm
Closeout
- Update result artifact: Annotiertes Diagramm
- Define location, version, and review recipients.
- Define owner, next step, and review date.
Work artifact
Pre-filled starting point based on the matching template.
work-artifact.md
Annotiertes Diagramm: Risk Storming
Working Question
Which risks are embedded in this architecture or plan artifact, and which of them need action before the next iteration?
Context
Architecture diagram distributed 1-2 days beforehand with request to read; list of known incidents/problems from last 6 months; Quality Attributes (security, availability, scalability); risk category definition.
Participants
- Owner: One facilitator who protects silent phase and moderates clusters
- Participants: One facilitator who protects silent phase and moderates clusters; 4-12 participants from mixed roles (architecture, engineering, operations, security, product); one scribe for owner assignment and actions.
Input
Large-format print or digital board with architecture diagram at least A1 size; red, yellow, blue sticky notes for risk categories (technical, organizational, external); markers; timer; risk scoring grid (probability/impact).
Template
Risk Storming Canvas
Context
What is this method used for?
Core question
Which question should be answered at the end?
Input
Which data, observations, or materials are available?
Working area
- Area 1:
- Area 2:
- Area 3:
- Relationships / patterns:
Output artifacts
- Annotated Diagram:
- Prioritized Risk List:
- Action Backlog:
Open questions
- ...
Next step
Owner, date, success signal.
Completion Check
- Annotiertes Diagramm is complete enough for review:
- Location:
- Version / status:
- Review by:
- Next step:
Next Step
- Review result
- Mark open questions
- Schedule review or decision
Risk Storming Working Template
View templateCompact working template for Risk Storming with context, input, output artifacts, and next step.canvas
risk-storming-working-template.md
Compact working template for Risk Storming with context, input, output artifacts, and next step.
Risk Storming Canvas
Context
What is this method used for?
Core question
Which question should be answered at the end?
Input
Which data, observations, or materials are available?
Working area
- Area 1:
- Area 2:
- Area 3:
- Relationships / patterns:
Output artifacts
- Annotated Diagram:
- Prioritized Risk List:
- Action Backlog:
Open questions
- ...
Next step
Owner, date, success signal.
- Working question, owner, and target artifact are visible.
- The result fits Annotiertes Diagramm.
- Snapshot per workshop with date, participant list and risk state. Repeat every 3-6 months as new entry, delta to previous version documented separately. Mark completed risks as Resolved, do not delete.
- Open questions are noted as follow-ups.
- The next review or decision point is scheduled.